Originally Posted by
Dave B
Two months for heavy maintenance, ? we used to be able to do a major check on a 212 in Two weeks, I thought progress meant improving things.
Don't blame the machine. Oil and Gas operators, who staff their bases properly, do get the inspections done quicker. We used to do the 300 hour in 3 days. A 4 year would be a couple weeks. As for "cost is high", a 139 is cheaper to purchase than a 76D and the DoC's are proven to be very close, if not better than a 76C++ (don't know DoC's for a 76D sorry). O&G operators proved that over and over again.
76's were perfect for mechanics though. They're job security because something always breaks. All the mechanics said I'd be first out of a job because I only worked on the 139 and there wasn't much to do compared to the 76.