You do indeed as 31.3mph is in brackets. The unconverted figure given is 50.4 km/h, which is another strange figure. The maximum incline is 5%, which is the maximum the cable haul system can cope with at Luton. This might explain why the route starts on a viaduct and ends up in a tunnel to reduce the incline?

Another strange figure is 170 passengers per train as that means 42.5 passengers can be carried in each carriage. Does than mean that the 2 outer cars are a different size to the 2 inner cars?

They also give the length of the track as 2080m long yet everywhere else it is quoted as 2200m. From memory Luton’s runway is 2160m long which almosts splits the difference.