How much cash can be saved by the terminal closing either a day at a time, or for a 3 month block period ? I agree that opening the terminal for just a single flight per day is not optimal, but staff presumably need to be paid throughout the winter if the airport wants (at least some of) them to remain available for work in the spring. I think a completely cold restart in spring with a need to recruit staff is perhaps overkill