PPRuNe Forums - View Single Post - UK SAR 2013 privatisation: the new thread
Old 22nd September 2020 | 12:07
  #2902 (permalink)  
TorqueOfTheDevil
 
Joined: Jul 2006
Posts: 1,196
Likes: 1
From: Among these dark Satanic mills
Originally Posted by [email protected]
I know a manufacturer won't design a whole new helicopter for SAR but offering an option with a longer tail boom to accommodate a larger rotor and thus reduce the downwash wouldn't be that difficult, would it?
Doing the latter is basically doing the former!
TorqueOfTheDevil is offline  
Reply