PPRuNe Forums - View Single Post - UK SAR 2013 privatisation: the new thread
Old 22nd Sep 2020, 12:07
  #2902 (permalink)  
TorqueOfTheDevil
 
Join Date: Jul 2006
Location: Among these dark Satanic mills
Posts: 1,197
Received 1 Like on 1 Post
Originally Posted by [email protected]
I know a manufacturer won't design a whole new helicopter for SAR but offering an option with a longer tail boom to accommodate a larger rotor and thus reduce the downwash wouldn't be that difficult, would it?
Doing the latter is basically doing the former!
TorqueOfTheDevil is offline