PPRuNe Forums - View Single Post - S-92 Underslung Load Q:
View Single Post
Old 3rd Sep 2020, 20:39
  #22 (permalink)  
Fareastdriver
 
Join Date: Oct 2006
Location: UK
Posts: 5,222
Likes: 0
Received 4 Likes on 3 Posts
The Puma had a load pole directly attached to the bottom of gearbox. The crewman could monitor the load through a 2'x1' hole in the floor. The pole was steadied by a bracket at the front of the hole and attached to a ring on the gearbox, as was the crewman's harness.

About fifty years ago a gearbox bottom fractured and the pole, with a jeep attached to it, went though the hole in the floor.

So did the crewman.
Fareastdriver is offline