PPRuNe Forums - View Single Post - Future of the USN Carrier Force
View Single Post
Old 24th Aug 2020, 16:05
  #50 (permalink)  
ORAC
Ecce Homo! Loquitur...
 
Join Date: Jul 2000
Location: Peripatetic
Posts: 17,409
Received 1,591 Likes on 728 Posts
I read that as 2 options- 1 is they will be finished BUILDING AND ASSESSING a full scale engine by 2025 ORi n 2025 they will finish three years of pushing paper around about building possible full scale engine Which is most likely?
apparently the first, as deliverables include both hardware and test rig data....

...”Funding for the NGAD and NGAP programs is accounted for separately in Air Force budget documents. The fiscal 2021 budget justification documents reveal that the Air Force spent $106 million for the NGAP in fiscal 2019. Another $224 million is allocated to the NGAP this year. But the program has requested an additional $403 million in fiscal 2021, the budget documents show.“The Next-Generation Adaptive Propulsion effort consists of four phases: preliminary design, detailed design, engine fabrication and engine assessments,” the Air Force’s budget documents state.

“Program deliverables include military adaptive engine detailed design parameters and models, engine hardware (plus spare parts), matured technologies, major rig assessment data (controls, combustor, etc.), program reviews, and technology, affordability and sustainability studies for next generation fighter aircraft,” the documents add......”
ORAC is offline