PPRuNe Forums - View Single Post - QF Air Turnback - QE Engineering
View Single Post
Old 19th Aug 2020, 03:43
  #2 (permalink)  
john_tullamarine
Moderator
 
Join Date: Apr 2001
Location: various places .....
Posts: 7,186
Received 94 Likes on 63 Posts
Caveat - I have no specific knowledge of the referenced matter.

Generally, an operator will run an NTO (No Technical Objection) request by the OEM before implementing a local protocol. If the OEM has a concern, that should be identified back to the operator. If not, the OEM generally will issue an NTO relating to the request.

It may be that the OEM didn't have all the story and made an inadequate call or that the operator didn't go through the usual processes - I would be surprised if that were the case for QF.
john_tullamarine is offline