Neil Brooker - Lake Murray special
25th March 1983
I was the second SAR to arrive at Lake Murray after a twotter from Tabubil.
ELCOM had just installed power lines near the western threshold which effectively restricted the strip to one way. As a sequence of electricity being supplied to Lake Murray a portable generator was being freighted out. This was loaded into the front of the 402 (P2-GKA) instead of the cabin.