Old 5th Jul 2020, 13:20
  #4038 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,862
Likes: 0
Received 0 Likes on 0 Posts
Now that the Dart at Parkway is taking shape I thought I would look at the drawings I have regarding the missing 33% of the station. So far the building has 4 central support columns but the drawings show 6 which would allow the new Thameslink platform walkway to join with the rest of the building. The missing section is from the top of the escalators.


Looking at this drawing, which is a reverse view from the plans above and below, the missing section is highlighted in mauve and is shown as a later phase, which I have mentioned before. I have assumed the later phase would immediately follow the first phase.


I am now thinking this won't be built any time soon, as there are more plans that show a 4 column station with lifts and a staircase attached to the end where the missing section of station should be. In the plan with the mauve section there seems to be a walkway from the existing footbridge to the interchange.
.
LTNman is online now