PPRuNe Forums - View Single Post - Perf Group A history
View Single Post
Old 7th Jun 2020, 12:14
  #56 (permalink)  
Discorde
 
Join Date: Jan 1999
Location: England
Age: 77
Posts: 1,196
Likes: 0
Received 28 Likes on 16 Posts
A trick - sorry, I mean procedure - we used on the B732 was 'improved climb'. If excess runway length was available we would calculate a higher VR and V2 to get a better L/D to improve 2nd segment engine-out gradient. I can't remember how we calculated the V-speeds and extra RTOW from the T/O perf manual data. A graph maybe?

Another dodge - sorry, procedure - to achieve higher RTOW was to visually avoid obstacles penetrating the nominal engine-out climb-out path if the weather was suitable. IIRC Naples R24 was an example.

So, did IC arrive at the same time as Perf A?
Discorde is offline