PPRuNe Forums - View Single Post - Luton-9
Thread: Luton-9
View Single Post
Old 15th May 2020, 23:54
  #3845 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,850
Likes: 0
Received 0 Likes on 0 Posts
Comparing the artist impression with the construction update, as previously suspected, there appears to be a major part of the station building missing. Drawings show 2 phases but whether that is for a station capacity upgrade for a second terminal or is needed for the current construction so the bridge sections could be built on site and lowered into position remains to be seen.

It has already been noted in previous construction updates that the existing building has no holes between the floors for lifts, stairs and escalators so I suspect there is another section of building due to be built this year.

Another question is what are those two steel towers for? Are they being built there to be moved later? Answers on a post card to ...

Last edited by LTNman; 16th May 2020 at 06:53.
LTNman is offline