PPRuNe Forums - View Single Post - Gatwick-2
Thread: Gatwick-2
View Single Post
Old 30th Apr 2020, 10:38
  #776 (permalink)  
Vokes55
 
Join Date: May 2016
Location: The EU
Posts: 641
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by bmaviscount
Why are they using R?
Were the limits airframe or weather?
Weather.

I assume they’ve been using 26R to allow maintenance/resurfacing to be done to the main runway during the shutdown. This regularly happens at night during the summer, but with the majority of based aircraft arriving back between 23-1 it actually causes a fair bit of disruption, as no runway is available for 10 minutes at a time when a lot of aircraft want to use it. Getting this work done now when it can be done for days straight, rather than just 5 hours per night subject to weather, is sensible.

Or it could’ve simply been to save money. With good weather and no heavy loaded departures, there’s no need for a runway with the length and equipment of 26L. A shorter runway with far fewer lights, ILS equipment switched off would save a fair bit on the lecky bill.
Vokes55 is offline