Originally Posted by
taffyhammer
Unfortunately that particular hangar, was incompatible with the maintenance of commercial aircraft mainly due insufficient building height and the low load weight of the floor.
Where does that come from? This is a report of the original PFI procurement
The aircraft hangar will occupy 45,000 square metres and will consist of a 48 bay fast-jet, deep maintenance hangar with full support facilities. The design will be able to accommodate a wide range of military and civil aircraft including C130, A320 and B737 aircraft. The design is also flexible enough to allow for future changes in service requirements.