PPRuNe Forums - View Single Post - RAF Poseidon - Not too long to wait?
View Single Post
Old 6th Apr 2020, 13:00
  #321 (permalink)  
David Thompson
 
Join Date: Jun 2012
Location: Teesside
Posts: 258
Received 12 Likes on 4 Posts
Originally Posted by RandomBlah
Perhaps because UK P-8A have not reached IOC yet (as planned) and therefore have not declared a capability for operational use?
The Poseidon achieved IOC on the 1st April , an unfortunate date , with the news appearing on the RAF Homepage ;

"We’ve just declared an initial operating capability for our Poseidon aircraft, on time on 1st April 2020. It’s a really exciting time for us in this programme, which is moving fast and the team at RAF Lossiemouth has delivered some great results in very quick time. We’ve still got a long way to go with introducing this next generation capability into Service, but Poseidon is a game-changer, not just for hunting submarines but for a range of other roles from anti-ship warfare, maritime reconnaissance and long-range search and rescue tasks."
Link here ; https://www.raf.mod.uk/news/articles...ng-capability/

I can understand the mention of both 120 and 201 Squadrons but what is the connection with 54 Squadron which is an ISTAR unit at Waddington ?
David Thompson is offline