Originally Posted by
bringbackthe80s
Surely ANA would get government’s financial support if this was to continue longer than 1 or 2
months. Would AJX not be included in this?
That's not my point, I'm not concerned with mainline ANA's ability to ride the storm, they have a lot of cash at hand and credit lines since they've been profitable even in down times like the Swine flu and The Fukushima disaster days.
My point is that we are contractors, if mainline makes the desicion to ground a large portions of its fleet that means mainline pilots sent home, I very much doubt that the mainline pilots union would be ok with mainline guys on forced LOA's while the gaijin are still at work, and lets face it, they would have a valid point!