PPRuNe Forums - View Single Post - Boeing, and FAA oversight
View Single Post
Old 16th Feb 2020, 14:25
  #232 (permalink)  
Twitter
 
Join Date: Jan 2020
Location: 900m
Posts: 0
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by MechEngr
What the FAA wants isn't to remove an individual wire but to remove and reconfigure multiple wire bundles; apparently by re-looming the wires into entirely new bundles.

It's tough enough to correctly fabricate and maintain bundles before installation with all the room of a factory floor - my experience is military ground vehicles up to 50 feet in length. Essentially remanufacturing the wiring post install in the confines of a fuselage is asking for nearly innumerable defects.

Running a wire all by itself alongside an existing bundle is a bad idea as it will easily move and chafe and fatigue or wear through, allowing short circuits or corrosion.
Thanks for the insight Mech.
Twitter is offline