Originally Posted by LTNman
The ski slope and supports wasn’t painted before it was transported down the hill so the road has got to be closed for painting. Think the airport approach road and the A1081 are meant to be closed overnight this week but the work might have been delayed.
Are you sure it will be painted? The “in thing” with these signature bridges is to use weathered steel. At least I recall reading that somewhere.

There’s a footbridge over a railway line in Chiswick, that’s been up over a year without any sign of a lick of paint. It’s a lovely shade of rust.


Edit: Found some pics to show what I mean.