So as a PPL working towards 200 hours and CPL, looking at this as a job that seems, from a flying perspective, to be fun, with no intention of going onwards to airlines or the like - recommended or not?
I'd heard the per load figures; I wasn't even aware that there were full-time positions.
I've pondered the JPA, JPA/Turbine through the AJPA but does it make sense to do those cold and then see who might have work or find the operator first and then do the required?