An AD would be issued only if an unsafe condition is determined to exist. I don't know if there are any safety concerns associated with the contamination. The rejection of parts in production is due to someone determining they don't conform to the approved drawing requirements. It's fair game for Boeing to reject them if the drawing doesn't allow the contamination, but with appropriate engineering determinations they could have accepted them under an MRB action unless the customer has now set higher standards.