PPRuNe Forums - View Single Post - Luton-9
Thread: Luton-9
View Single Post
Old 16th Dec 2019, 15:21
  #3195 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,847
Likes: 0
Received 0 Likes on 0 Posts
Construction update

Parkway interchange continues to receive its upper steelwork. In the background the Gateway Bridge can be seen. In the foreground two mysterious steel structures have appeared in recent weeks.


The embankment by taxiway Bravo has been removed.


The ring road is getting close to being rerouted away from taxiway Delta and will hug the second multi story. The right hand curve will link the service road. The former drop off zone is being used as a parking area for staff to park meet and greet cars


Comparing the artists impression with what has been built so far it looks like the higher roof support will have concrete slabbing around it. Note the lip on the concrete retaining wall for some sort of roof just outside the station area.




Last edited by LTNman; 16th Dec 2019 at 20:30.
LTNman is offline