PPRuNe Forums - View Single Post - Luton-9
Thread: Luton-9
View Single Post
Old 29th Nov 2019, 10:41
  #3123 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,861
Likes: 0
Received 0 Likes on 0 Posts
Construction update

Parkway Dart station is receiving its top floor. Are the side walls going to be attached to the roof or will there be a gap like at the terminal station?


Taken a couple of days ago. The Gateway Bridge is now on jacks with Thunderbirds 2 heavy movers being assembled (remember Fire Flash?)


Taken today. All is ready for the big move that starts tonight. The bridge never did get painted so will have to be done after installation.


With one lane closed on the dual carriageway from the Ibis this was the queue this morning. From 8pm tonight until Monday morning the airports main access road will be closed as will the A1081 to Hitchin in both directions. The diversion route is torturous with many junctions and a retail park so expect massive delays back to the M1.


Above the Dart maintenance area

Last edited by LTNman; 29th Nov 2019 at 11:07.
LTNman is online now