Railings have been attached to the curved Gateway bridge which is now just waiting for the painting to be finished before the big move. Careful examination shows the temporary power cable for the red aircraft warning light
Taxiway Bravo continues to be dug out. In the distance to the right of the departing Wizz sheeting for a shallow Dart trench is being piled in the mid term car park. In the top right hand corner can be seen the Gateway Bridge
One part of the twin Dart tunnel
Central station is getting its roof supports installed plus the beams to keep the walls apart.
Maintenance area for Dart has had its temporary yellow jacks removed
Bus station seems to be growing wider with a new wall going in. A non-commissioned bus bay has finally been completed with what looks like another one being built.