Originally Posted by
JW95
Any updates on the status of the arrivals terminal? If I recall, construction was due to start towards the end of 2018, but has since gone quiet (didn't see much work going on when I was last at STN in September).
Also, does anyone have any updates on the terminal transformation programme?
The construction was placed on hold when UDC decided to withdraw its permission to allow Stansted to go up to 42 Million passengers.
The Terminal is still having work done in other areas in terms of the transformation project. A lot of these works as back of house so won’t be noticeable when traveling.