Originally Posted by
BDAttitude
Hazard Analysis being done as a pro forma excercise to sign off an existing design, not as part of discovering subsystem requirements before implementing something.!
That appears to be the norm for most of the systems I've worked on. The same seems true for most of the "design" documents.