PPRuNe Forums - View Single Post - MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Old 23rd Oct 2019, 10:05
  #3356 (permalink)  
WHBM
 
Join Date: Oct 2002
Location: London UK
Posts: 7,660
Likes: 0
Received 21 Likes on 17 Posts
From the Boeing site re executive bios

Since joining Boeing in 1986, Deal’s broad range of leadership positions includes leading integrated product teams for propulsion systems and structures on the 717 program, and serving as program manager for the for the MD-11 Japan Airlines program.
This doesn't sound quite right. The Japan Air Lines MD-11 were delivered (only 10 of them) in a trickle 1993-97, before McDD merged with Boeing. I presume therefore he actually worked for McDonnell Douglas before the merger.
WHBM is online now