PPRuNe Forums - View Single Post - Power check technique for twin turbines
View Single Post
Old 26th August 2019 | 01:06
  #1 (permalink)  
HeliHJ
 
Joined: Apr 2016
Posts: 5
Likes: 0
From: Surrey
Power check technique for twin turbines

Could anyone enlighten me with an “on the job” technique method for power checking before going into a landing site. I currently fly light SEP’s and curious as to how you go about it on a big bird.
For info, one method I have been taught:
25kts gnd speed
check power
add 15% for IGE
add another 15% for OGE

thanks!
HeliHJ is offline  
Reply