PPRuNe Forums - View Single Post - The Biggest Jet Engines in History Are Finally Ready to Power Boeing's Biggest Plane
Old 23rd Aug 2019, 21:06
  #62 (permalink)  
SeenItAll
 
Join Date: Nov 2005
Location: Potomac Heights
Posts: 470
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Turbine D
It will be mainly by truck using the interstate highway system or other roads where clearances have been thoroughly checked out, day or night. If need be, engines can be shipped by heavy lift aircraft, e.g., AN-124s. This was done in the early days of the GE90 production to support Boeing's 777 aircraft schedules at the time.
A post above says that their carrier is 14 feet wide and 13 feet tall. While the 14 feet wide can be handled as special wide-load transport, 13 feet tall plus about 2 feet of truck bed height gives you a need for at least 15 feet of clearance. I don't know what interstates they travel on, but the ones that I travel on have a lot of bridges that don't exceed 14-some feet of clearance. It must end up being a pretty convoluted route.

See https://www.wsdot.wa.gov/data/tools/...mainline=false for the final push through Washington State.
SeenItAll is offline