Construction update

Gateway bridge for the Dart is being prepared for the concrete tracks.


Taxiway Bravo diversion has opened which will allow the existing taxiway to be dug out for the Dart tunnel.


As reported before the multistory car park numbering has been reversed. The new car park which has now opened is Car Park 2.
Photo shows the foot entrance with the first floor ramp that connects to the ring road just forward of the netting which is protecting a missing section of the first floor.


The car park has opened with no working lifts. Due to the height of the ceiling of the drop off area passengers are having to lug suitcases up 4 flights of stairs to reach the first floor. The staircases are half the width of the other multistory and seem to be built as just a fire escape. All windows have been boarded up due to a lack of window frames and glass.


Only the first floor is open


The pay barriers are on the first floor