Originally Posted by
jindabyne
I believe the training time is very similar MPN11; it's the holding times, generally speaking, that are horrendously wasteful. In my case (old fart hat on), Feb 62 - Jun 64 was join date to arrival on 8 in Aden; that included a two-month hold. That was the norm.
Yes, that's what I figured. Horrendously wasteful, isn't it!