PPRuNe Forums - View Single Post - MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Old 20th Aug 2019, 10:10
  #1936 (permalink)  
Speed of Sound
 
Join Date: Jul 2002
Location: Ireland
Posts: 596
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Less Hair

Is this still work in progress?
I suspect that the recent silence is because Boeing is now locked in negotiations with the FAA about what is the minimum they have to do to get the fleet ungrounded, and the FAA is talking to other international regulators as to what they see as the minimum acceptable solution to allow a global ungrounding.
Speed of Sound is offline