PPRuNe Forums - View Single Post - MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Old 1st Aug 2019, 19:23
  #1682 (permalink)  
groundbum
 
Join Date: Dec 2001
Location: Leeds, UK
Posts: 281
Likes: 0
Received 0 Likes on 0 Posts
as an IT engineer this changing from flip-flop to dual reduandancy is massive, and unless work started years ago will NOT be ready for September. And if it has been rushed then it needs full end to end testing as it's such a fundamental change. There's a philosophy in coding that for every 2 things you fix, you break something else. It's the nature of the beast.

G
groundbum is offline