Originally Posted by Hot 'n' High
It sounds as if the new engines have brought a new threat against the rudder cables - from just what has been reported - but the new engines would need full certification anyway so that should have been picked up on the Max "delta certification" work. Is the FAA now saying that this did not take place?
According to the NYT investigative piece, linked above, FAA engineers were aware of the risk and suggested possible changes, but Boeing resisted and FAA managers ended up allowing B to self-certify the relevant design.

The F.A.A. engineers suggested a couple solutions, three of the people said. The company could add a second set of cables or install a computerized system for controlling the rudder.

Boeing did not want to make a change, according to internal F.A.A. documents reviewed by The Times. A redesign could have caused delays. Company engineers argued that it was unlikely that an engine would break apart and shrapnel would hit the rudder cable.

Most of the F.A.A. engineers working on the issue insisted the change was necessary for safety reasons, according to internal agency emails and documents. But their supervisors balked. In a July 2015 meeting, Jeff Duven, who replaced Mr. Bahrami as the head of the F.A.A.’s Seattle operation, sided with Boeing, said two current employees at the agency.

F.A.A. managers conceded that the Max “does not meet” agency guidelines “for protecting flight controls,” according to an agency document. But in another document, they added that they had to consider whether any requested changes would interfere with Boeing’s timeline. The managers wrote that it would be “impractical at this late point in the program,” for the company to resolve the issue. Mr. Duven at the F.A.A. also said the decision was based on the safety record of the plane.

Engineers at the agency were demoralized, the two agency employees said. One engineer submitted an anonymous complaint to an internal F.A.A. safety board, which was reviewed by The Times.

“During meetings regarding this issue the cost to Boeing to upgrade the design was discussed,” the engineer wrote. “The comment was made that there may be better places for Boeing to spend their safety dollars.”

An F.A.A. panel investigated the complaint. It found managers siding with Boeing had created “an environment of mistrust that hampers the ability of the agency to work effectively,” the panel said in a 2017 report, which was reviewed by The Times. The panel cautioned against allowing Boeing to handle this kind of approval, saying “the company has a vested interest in minimizing costs and schedule impact.”

By then, the panel’s findings were moot. Managers at the agency had already given Boeing the right to approve the cables, and they were installed on the Max.