PPRuNe Forums - View Single Post - Taxi Workload
Thread: Taxi Workload
View Single Post
Old 25th Jul 2019, 18:46
  #7 (permalink)  
Musket90
 
Join Date: Jan 2004
Location: England
Posts: 762
Likes: 0
Received 0 Likes on 0 Posts
In the event of failure of A-SMGCS during low vis the procedural control would surely result in reducing the number of movements at any one time.. Remember Milan Linate early 2000's where there was no A-SMGCS and the only two aircraft moving collided on the runway with a catastrophic result.
Musket90 is offline