Originally Posted by
LTNman
The present stand count, terminal and general infrastructure were designed for 18 million passengers. No point in building more stands if the terminal can't cope but now we have another 8 stands. So what does that tell you?
Tells me there’s a lot going on in the background that we are all unaware of.
Just looking at the map, there are very few places that a two stand area would fit perfectly
Could it be that this is the area by the run up bay and not the current drop off area.Have plans totally changed?
Strange that Stands 1-9 need restrengthening, do they have to meet a new standard or are they showing physical signs of cracking?