PPRuNe Forums - View Single Post - MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Old 23rd July 2019 | 09:56
  #1484 (permalink)  
BDAttitude
 
Joined: Apr 2019
Posts: 334
Likes: 0
From: EDSP
From what I have made up from the sparse information available is that the problem is probably the redundancy path in the Zilog CPU if the 286 is faulted.
So I would assume it is task scheduling and synchronization in the the secondary ("even less powerfull") CPU. I'd be curious when this was tested the last time before the FAA inspection.

BDAttitude is offline