Originally Posted by
scousechris
No it wasn’t incorrect at all. It was planned to operate the MT2604 03.07.19 after arriving the previous day. Due to further work required before entering service, it was swapped and OMYT operated. It operated the MT2924 to LAS as planned today.
I hold my hands up, and admit I've made myself out to be a tw*t! I was looking at the A/C programme FROM the 8th to the 14th........