PPRuNe Forums - View Single Post - Antonov AN-124-100?
View Single Post
Old 2nd Jul 2019, 16:58
  #3 (permalink)  
aloominumtoob
 
Join Date: Dec 2017
Location: Guardamar
Posts: 50
Received 1 Like on 1 Post
An124-100 Crew.

Hi,
When I started working with Antonov Design Bureau (ADB) on the 124-100, we would trundle around with a total crew of.......22. at the pointy end, there were: 2 pilots, 1 Navigator, 2 Flight Engineers and 1 Radio Operator. Therefore,a basic operating flight deck crew of 6. To this we had an extra pilot and an extra navigator for "long days." In addition, up front we had 1 Western Flight Manager (Air Foyle's rep.,) and 1 Ukrainian Flight Manager (ADB.) So, pointy end = 10. In the rear compartment, there was 1 Loadmaster and 11 Technicians/Loading crew. which puts us up to the 22. Over a period of a few years, we AF Flight Managers put it across that if some of the Techies were cross trained it would save the company roundabout $4 million per year. The crew was then reduced to 18, knocking off 4 techies. It does seem a lot of people, but remember, the techies were also the loaders, and with the type of aeroplane, the aircraft equipment and systems plus the type of loads we carried, western ways of doing things etc., would not have worked. On quite a few ocaisions we have taken over 24 hours to load, (we didn't have unions), and that was not due to the loaders being slack, but due to the complexity of the load. We started the load and did not stop until it was all on. Meals taken in shifts.
I was proud of the time I worked with ADB and the work we all did. A very strong, dependable aeroplane as is the 225.
Cheers the noo,
alt

Last edited by aloominumtoob; 2nd Jul 2019 at 16:59. Reason: Typography.
aloominumtoob is offline