PPRuNe Forums - View Single Post - MAX’s Return Delayed by FAA Reevaluation of 737 Safety Procedures
Old 27th Jun 2019, 08:47
  #723 (permalink)  
peteturbo
 
Join Date: Oct 2018
Location: uk
Posts: 3
Likes: 0
Received 0 Likes on 0 Posts
If an unidentified failure - cpu overload due to MCAS operations - leads to an unidentified fail state - uncontrollable operation of controls - is this a system operating as expectable since the designers havent designed the system properly?
Systems analysis requires identification of all reasonably foreseeable events, and 'computer operation overload', and the resultant fail state condition must surely be one of them.
peteturbo is offline