The existing terminal and security setup was designed for a F50 that was usually operating on loads of about 50% capacity.
To upgrade the terminal / build a new one and procure the required equipment in that short space of time is a very bold undertaking.
Well at least the massive 3 x A330 bay apron might see a bit of use apart from the F100 charters to the Pilbara