PPRuNe Forums - View Single Post - IAG LOI for 200 737 MAX
View Single Post
Old 20th Jun 2019, 13:06
  #19 (permalink)  
Astir 511
 
Join Date: Nov 2007
Location: UK
Age: 54
Posts: 27
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Giant Bird
Ordering the MAX while it is still grounded I see as as poor ethics and a slap in the face to passengers it makes a mockery of safety comes first. I am personally boycotting BA in future on principal.
Poor Ethics?? The aircraft wont be delivered until long after the current challenges have been addressed. People need to get a grip, the MAX issue is a huge challenge to Boeing, but it will get addressed just like the other historical grounding events 787 Battery Issue, or DC10 Cargo Door/Pylon issues. The world keeps on turning.
Astir 511 is offline