PPRuNe Forums - View Single Post - S-92s on the road through Queensland
View Single Post
Old 26th May 2019, 09:50
  #14 (permalink)  
Variable Load
 
Join Date: Feb 2001
Location: Sometimes here, sometimes there
Posts: 440
Received 6 Likes on 3 Posts
Originally Posted by Kulwin Park
Whilst they're down in the UK, it will probably be a good time to upgrade them from the recently announced S92-A to the -B option of better performance kit?

https://www.rotorandwing.com/2019/03/05/sikorsky-offering-a-upgrades-to-fielded-s-92-fleet-new-build-b-models-beginning-2022/
I've not seen anything in the press release that indicates an increase in performance, other than better "hot and high" performance of the CT7-8A6. The engine upgrade is also described as an "option", rather than being a standard for the A+. The N Sea doesn't qualify as either hot or high

An operator funded upgrade will only happen if there are either payload (reduced fuel burn) or direct operating cost benefits. Although the promise of a gearbox that fully complies with the "loss of oil" certification requirements might be enough for some oil companies to insist on (and fund?) the upgrade when it's available.
Variable Load is offline