Originally Posted by
cauc0001
Dear Everyone,
I was confused that if we encountered two or three faults items, number one fault require reduce RTOW 1300KG, number two fault require reduce RTOW 2500kg, number three fault require to reduce 2300kg.
How can I do the calculation? Because in the MEL, which said each MEL is only apply to one fault can not consider combined fault.
Thank you for your help.
If you took the 2500kg penalty that would already account for the other 2 penalties imho. That assumes these penalties all apply to the take-off phase.
You would still need to do the operational procedures (if any) for each fault.