PPRuNe Forums - View Single Post - Bristol-5
Thread: Bristol-5
View Single Post
Old 24th Mar 2019, 22:19
  #336 (permalink)  
TartinTon
 
Join Date: Jul 2003
Location: On the road
Posts: 913
Likes: 0
Received 0 Likes on 0 Posts
Plus there would be a long certification process as Logan are neither IOSA or CARA cleared so you're looking at a minimum 18 months from start to finish assuming that they have adequately qualified personnel in place. LH won't touch them with a barge pole until they can pass these standards.
TartinTon is offline