PPRuNe Forums - View Single Post - Changes: None. (Jeppesen)
View Single Post
Old 3rd Mar 2019, 03:26
  #3 (permalink)  
AmarokGTI
 
Join Date: Feb 2008
Location: AUS
Posts: 42
Received 7 Likes on 5 Posts
Originally Posted by 100 above minimums
Hey.

I was wondering why sometimes on the bottom left corner of a Jepp they would add (Changes: None)
I read somewhere once that it was because the procedure on the back of the same sheet was changed thus the need to reissue the unchanged procedure with (Changes: None). Can anyone confirm this?

But what got my mind going is that sometimes there would be a newly issued chary with an effective date but then there would be no change. Why is there a need to add an effective date when it's practically the same procedure before and after the effective date.
One of the notable benefits is to help ensure crew are briefing off the same chart.

I use DAPS now but my previous company (Jepp) wording for the brief “ILS Z Runway 23 Adelaide South Australia (Chart ID) (Chart Date)”
AmarokGTI is offline