PPRuNe Forums - View Single Post - Luton-9
Thread: Luton-9
View Single Post
Old 22nd Feb 2019, 06:57
  #2324 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,850
Likes: 0
Received 0 Likes on 0 Posts
The route for the Dart shows it cutting a swathe through the approach lighting to runway 08. This will involve a cutting being dug for the track. So does anyone know it the CAT 3 status of the ILS will be maintained with a chunk of lighting missing? I assume lighting bridges will be erected over the cutting at some point. From memory, with the already non standard length of the approach lighting, CAT 1 aircraft already needed higher minimums anyway so I assume CAT 1 only approaches would need even higher minimums.




Last edited by LTNman; 22nd Feb 2019 at 07:08.
LTNman is offline