Three minute fixing, and no transferring from Gee to plotting chart, and no DRing was easy in the Meteor.
I think the procedures on the Varsity were designed to be awkward: various Gee Chain charts, a consol chart, the ERC, topo, and everything plotted on the 1:1m plotting chart. Not forgetting that every radio beacon etc that you planned to use had to be plotted too.