Originally Posted by
LTNman
The entry and exit route have now been diverted. In the top left hand corner the first part of the DART route can be seen as all the soil has now been dug out. The cut and cover tunnel will continue to the left of the existing road tunnel and cut through the existing embankment onto the roadway
That looks like a sharp left upon exit from tunnel inbound for buses?