PPRuNe Forums - View Single Post - Helicopter down outside Leicester City Football Club
Old 18th Dec 2018, 21:27
  #1140 (permalink)  
nodrama
 
Join Date: Mar 2007
Location: UK
Posts: 321
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by nodrama


No. Six nuts hold the actuator (servo, hyd unit) onto the gearbox. There’s the two nuts either end of the pitch control rod (shaft) and one bolt/ nut attaching the flying controls to the input/ feedback lever. 4 hydraulic pipe unions, and some electrical plugs. That’s it. Very straight forward.
The pitch control rod (shaft) just passes through the centre of the duplex bearing (which is part of the spider) when the actuator (servo, hyd unit) is fitted to the back of the gearbox.
Part of the above is incorrect (I was watching the football, pathetic penalty shoot-out). The nut on the servo end of the pitch control rod doesn’t get touched during an actuator replacement. It is part of the hyd actuator component and assembled/ locked at manufacture of the component.
nodrama is offline