PPRuNe Forums - View Single Post - RFDS Pilatus PC24
View Single Post
Old 15th Dec 2018, 06:58
  #97 (permalink)  
FGD135
 
Join Date: Apr 2008
Location: Australia
Posts: 669
Likes: 0
Received 0 Likes on 0 Posts
No, the crew are tasked with enough time to preflight, plan and load. All regional crews are on standby at home, there is no need to be tied up for 3-5 hours.
You're referring to pilot duty time. I wasn't. I was referring to the fact that, even though the Broome crew may not yet have been tasked, they and the aircraft have been allocated to the job. Those resources are thus tied up - thus somewhat defeating the purpose of having the jet.

That 3-5 hour preliminary tie up does not happen when the aircraft comes from Perth/Jandakot.
FGD135 is offline