Going back to your post of 2nd December you said the other tender, which was for a new south east stand, was actually an apron as per your comment below but I have never found that notice you quoted. Can you provide a link as your conclusion was new stands on the drop off area while I was thinking what is now proposed.
Originally Posted by
Falcon666
If you read the Contract Notice section 11.2.4 they do actually state Stands.
I believe this is the area designated between the East Apron and South Stands which will become available when MSCP2 is built. Just an apron as Lot 1 states a value of £700k for it.Lot 2 ( local works) doesn’t have a value inserted but states the whole project will be capped at £2.5 Million.So what will the local work be at circa £1.8 Million.
A Pier extension? how much did the new Pier cost I wonder!
The latest tender is for a design rather than a build and could be linked to a terminal 2 which might be years away although it would not stop the apron being built.